Descrizione
Guarda la Traduzione
Whole house is being renovated but focusing on the master suite of the second floor, Jack and Jill bedroom on the east side of house will stay as in the proposed plans
RECONFIGURE THE MASTER SUITE-- original plans uploaded and proposed plan.
master bedroom is part of an addition at north end of house, CHANGE TO ORIGINAL SUBMISSION- MASTER bedroom can change location if you think it would be helpful to make this the bathroom instead, for instance. All walls can change except the one adjoining the new addition to the old house, ideally that would stay but an opening can be made into it.
window fenestrations cannot change
you can change hallway to, ALL WALLS CAN BE MOVED, fireplace will be removed
please reconfigure the western side of house
keep master bedroom in current location as shown in the addition of the proposed build (master bedroom is a new addition)-- backstair as seen in the current conditions is coming out and addition being built which will be master bedroom
need for :
a master bathroom with his and her sink
possible space for a vanity as shown in current proposal
a larger closet than now- preferably his and her closet sections or two separate closets??
possibly make Alex's bathroom into a possible second floor laundry room ?? (Alex will go to third floor to make room for newer closet)
elevator as shown in the proposed plan needs to be built in location as shown-- fireplace in current conditions being removed to make room for elevator which must stay where it is
the circle in a square is a laundry shoot that needs to stay in location
perhaps make Alex's room into a closet that connects into a laundry room (Alex's bath)
Alex's bedroom would go to third floor- third not shown in plans
the house walls are made out of plaster and we would like to maintain historical elements but give it more of an updated, transitional look. think blues and greys and whites and ebony floors or extra light floors
new electric and new plumbing is needed
We have radiators but will remove and have HVAC system
Preferenze
Guarda la Traduzione
we are trying to make this as high end as possible but of course we have financial restrictions but budget is fairy high so design as you would like
we would like to keep the floor plan as affordable as possible but we are seeing that a lot of walls need to be moved if we want our goals to be achieved.
SEE last PDF showing old and possible new floor plan in files section
We don’t want super modern, no farmhouse look. It should be clean lines and a transitional look with a very small amount of glam.
Loved arcbazar. Amazing crowd sourcing. Such talented and so helpful to my large renovation project.